Your New Pool Oasis In 10 Days

1. Council Approval And Mark Out

We provide engineering documentation so you can arrange council approval for your luxeworks pool. Most of our customers use a Building Certifier to manage this step on their behalf. Or, your professional pool installer can do this for you. Council approval normally takes around 2 weeks using a Building Certifier or between 3 and 12 weeks applying directly to Council. Once your luxeworks fiberglass pool is approved, you are ready to go. A template of your pool is then marked up where your pool is being installed ahead of excavation.

2. Excavation

We provide the excavation dimensions needed for your pool (dig sheet) as part of your luxeworks pool kit. An excavator will excavate a hole to the shape of your pool and a bobcat will remove the soil to a waiting truck. If you have a side access narrower than 3m, smaller equipment will be used which will add to the excavation time and cost. Check that hauling the soil away is included in the excavation price. Expert tip – try www.fillwanted.com.au to see if there is a site close by to take your soil for free.

3. Bedding

To ensure your luxeworks pool is level and has adequate groundwater drainage, the fiberglass pool shell will rest on a layer of bedding material. This is usually a porous material such as crusher dust or an aggregate material no bigger than 7mm. We provide you with a copy of the Australian Standards 1838:2021 for fiberglass pool installation as part of your luxeworks pool kit. These Standards are easy to understand and follow during the installation process. 

4. luxeworks Pool Kit Lift In

Now it gets exciting. We arrange delivery of your luxeworks fibreglass pool kit to your front kerb. Your pool can be lowered onto your front verge for installation at a later time. Or a crane (if needed) will lift your fiberglass pool shell over your house and lower it into place. If you have powerlines and/or a two-story house in the way, it is no problem. You just need a bigger crane! The cost to hire a crane is usually between $500 and $1,500 which either yourself or your installer will need to arrange. 

5. Plumbing Connections

With the pool resting in place, the return jets (sometimes called eyeballs), skimmer box and any other plumbing provisions for spa jets, deck jets and heating are connected with plastic Class 9 PVC plumbing and two part glue. From the skimmer box to pump is usually 50mm plumbing and all other connections 40mm. All plumbing connections should be pressure tested for leaks before backfilling. To assist with managing ground water levels, a 65mm PVC standpipe is installed in conjunction with a hydrostatic valve in the floor of your luxeworks pool.

6. Backfill And Level

Backfilling is a nice way to say “fill in the hole” around your fibreglass pool shell. To ensure longevity, your pool is backfilled with cement stabilised crusher dust. This prevents the backfill from being eroded away and future pool movement. Your luxeworks pool will be slowly filled with water while being backfilled to ensure that once full, it is perfectly level and the pool walls straight. In this image, the plumbing on the left side of the pool is for the water feature, pump, filter and chlorinator.

7. Concrete Bond Beam

To prevent movement, a beam of concrete is laid around your entire luxeworks pool. The concrete is reinforced with an S12 steel bar and physically tied to the underside of the pool edge (called coping) of your pool to prevent separation. Concrete is worked under the coping and grips the steel bar as it dries. The coping is 200mm wide and provides a structurally strong foundation for your luxeworks fiberglass pool edge tiling (called coping tiling). If your tiles are longer than 300mm, the bond beam width can be increased to the size of your tiles.

*BOND BEAM IS NOT REQUIRED IN WESTERN AUSTRALIA

8. Coping Tiles And Filtration

The bond beam will reach 90% of its final strength within 7 days allowing coping tiles to be laid. Your luxeworks fibreglass pool equipment is now installed and tested.  This is the completion of basic installation. Pool fencing, cleaning and balancing the water, landscaping and further paving can be completed by your installer or you can arrange these trades directly yourself to save more money. Our water features are designed to neatly house your pump, filter and chlorinator as can be seen in this image. All you need to do now is tell the kids to get their bathers on!